After you order

Delivery, Training & Support

From the first drawing to a station welding in your workshop: what happens at each step, what is included and what is priced separately.

Operators learn to run the station in 1–5 days, and our engineers support your team after start-up.

From Inquiry to Production

  1. 1

    Free part evaluation

    Send drawings, models or photos. Our engineers check the welds and recommend a station. We reply within one business day. Our software and hardware engineers join the evaluation to confirm your part types and welding requirements.

  2. 2

    Proposal and quotation

    Station layout, site requirements, options, spare parts and commissioning are set out in one factory-direct quotation.

  3. 3

    See it first

    Watch the robots on a live video tour, or visit our plants and operate one yourself.

  4. 4

    Order and delivery

    We build your station and ship it from China. Delivery time is confirmed in the quotation.

  5. 5

    Installation and commissioning

    Our engineers can install and commission the station at your workshop; the cost is listed in your quotation.

  6. 6

    Training and start of production

    Your operators train on your own parts and learn to run the station in 1–5 days.

Orange welding robots wrapped in protective film and packed for shipment.
Welding robots packed for shipment.

What Is Included and What Is Optional

ServiceHow it works
Part evaluationFree. Engineers review your parts and recommend a station before you order.
Station equipmentAs quoted: robot, rail or cantilever, welding package, vision and teachless software.
Site requirementsSupplied with the proposal, so you can prepare the floor, power, gas and air in advance.
Installation and commissioningOptional on-site service by our engineers. The cost is listed in your quotation.
Operator trainingOn your own parts; operators learn to run the station in 1–5 days.
Spare partsChoose a spare-parts package when you order — most customers take one year’s worth.
Remote supportOur engineers help your team by email and video call after start-up.
WarrantyTerms are set out in your contract.
Software updatesFree for the life of the station.

Training: Operators, Not Programmers

Because the stations are teachless, your operators load parts and start jobs rather than programming the robot. They learn to run the station in 1–5 days.

  • Loading jobs from the model or the QR code on the part label.
  • Starting, monitoring and checking welds.
  • Simple teach mode for special welds and touch-ups.
  • Daily checks and routine maintenance of the torch and station.

One trained operator runs 3–6 stations.

Operators working at a rail-mounted welding robot station.
Engineers and operators setting up a welding robot.

Spare Parts and After-Sales Support

Spare parts

Spare parts are quoted separately from the station, so you only pay for what you need.

When you order, choose a spare-parts package sized to how hard you will run the station. Most customers choose one year’s worth, some choose two years, and some prefer to buy parts as needed.

We list the recommended parts and quantities in your quotation.

Consumables and spare parts are kept in stock, so we can supply them promptly.

Support after start-up

Our engineers support your team remotely by email and video call. Send photos, videos or error messages and we help you find and fix the problem.

If an engineer needs to visit your workshop, the visit is arranged and quoted separately. Warranty terms are set out in your contract.

Preparing Your Workshop

With the proposal you receive the site requirements for your station. Typical items to prepare:

  • Floor space and a level foundation for the rail or cantilever frame.
  • Electrical power for the robot and welding power source.
  • Shielding gas supply.
  • Compressed air for the torch-cleaning station.
  • A crane or other handling to load and unload parts.
  • Bring the gas and power supply lines to the station and provide supports for cables and pipes.
  • For installation and commissioning, have lifting equipment, a welder and a fitter available to assist.

People

  • 1 operator who can use a computer and CAD software.
  • 1 mechanical maintenance technician and 1 electrical maintenance technician.
Rows of orange rail-mounted welding robots welding steel beams along a long structural steel production hall.
Welding robot stations in a structural steel workshop.

Delivery and Support Questions

Common questions about buying and running our welding robots.

A row of orange welding robots on red ground rails in a factory.
Rows of rail-mounted welding robots in production.
Is installation included in the price?

On-site installation and commissioning is an optional service, quoted separately. Its cost is listed in your quotation so you can compare the full project cost.

How long does operator training take?

Operators learn to run the station in 1–5 days, training on your own parts.

How do spare parts work?

You choose a spare-parts package when you order; most customers take one year’s worth. We recommend the parts and quantities in the quotation.

How do you support us after start-up?

Our engineers help your team by email and video call. An engineer can also visit your workshop; the visit is quoted separately.

How is the station delivered?

We build the station and ship it from China. Packing and delivery time are confirmed in the quotation.

Plan Your Welding Robot Project

Send a drawing, model or photo of a typical part and your workshop location. We recommend a station and quote the equipment, commissioning and spare parts — free of charge. We reply within one business day.

Or email sales@steelweldingrobot.com